About Keruilai

About Keruilai

Keruilai was founded in the year 2001, and over the course of the last 22 years, the company has consistently strived for excellence. As a result of its unwavering dedication, Keruilai has become a well-known global organization. It boasts advanced manufacturing facilities, a state-of-the-art research and development center, and a strong and effective sales network.

Learn more
Products

Products

Since its inception, Keruilai has dedicated its efforts to the advancement and manufacture of evaporative air coolers designed for industrial, commercial, and residential use, all under one roof. Presently, Keruilai offers comprehensive solutions to cater to various air cooling requirements, spanning from 300 cubic meters per hour (CMH) to an impressive 100,000 CMH airflow capacity. Keruilai's global presence extends to 50 countries and continues to expand steadily.

Learn more
Solutions or Applications

Solutions or Applications

Over the course of several years, Keruilai has assembled a remarkable team of professionals who possess extensive expertise and experience in various domains, including research and development, product management, sales, and marketing.

Learn more
Technical support

Technical support

Keruilai possesses state-of-the-art laboratories dedicated to enhancing the efficiency of large-scale evaporation, measuring air volume and pressure, and assessing noise levels.

Learn more
Events

Events

the evaporative cooling technology of Keruilai is also highly recognized by the industry. As the leader of the drafting group and the main drafting unit, Keruilai has participated in the formulation of a number of national industry standards for evaporative air conditioners and cooling fans. And obtained more than 50 patents for domestic inventions,utility model and appearance.

Learn more
Contact us

Contact us

Thanks to the exceptional teamwork, Keruilai received numerous prestigious accolades, including designations such as "Notable Trademarks of Guangdong Province," "Guangdong's Distinguished Brand Product," "High-Tech Enterprise," and "National AAAA Standardization Excellence in the Industry," among others.

Learn more
076922188788Ext.963
400 168 3989
Welcome message
Thank you for your attention. Please fill in your information and we will contact you as soon as possible.
Company events
News and events

Air duct requirements for installation of environmentally friendly air conditioning engineering

Release time:2023-08-14
Reading volume:270

Only when the environmentally friendly air conditioner  is installed correctly can it play its role in ventilation, cooling, dust removal and odor removal. Below, Keruilai shares with you the air duct requirements for the installation of environmentally friendly air conditioning projects.

  1. The installation form of the air duct of Keruilai environmentally friendly air conditioning project:

  The air ducts of environmentally friendly air conditioning projects are divided into two types: open duct installation and concealed duct installation. Different installation forms are selected according to different places. High-end places that require beautiful appearance are suitable for concealed air ducts, and the engineering cost is high; while places with low general requirements require saving engineering costs, so exposed air ducts are suitable.

  2. Precautions for air duct installation in Keruilai environmentally friendly air conditioning project:

  2.1 The flange gasket should be made of closed-pore, low-polymer material. The thickness of the gasket should be 3-5MM. The gasket should be flush with the flange and must not protrude into the air duct;

  2.2 Before hoisting the pipe, form a certain length on the ground and then hoist it. After hoisting, the air duct elbow and air duct connection cannot withstand external force;

  2.3 If the surface-mounted air duct is installed unevenly, the horizontality deviation shall not be greater than 3MM per meter, and the total deviation shall not be greater than 20MM;

  2.4 The horizontal and vertical required positions of concealed air ducts should be correct without obvious deviation.

 

Environmentally friendly air conditioner

 

  3. Precautions for the installation of air duct supports and hangers in Keruilai environmentally friendly air-conditioning projects:

  3.1 The hangers are fixed with steel expansion bolts, and the spacing should be no more than 3M.

  3.2 The boom of the hanger should be straight, with complete and smooth threads. The boom should be spliced ​​by overlap. The overlap length should be no less than 6 times the diameter of the boom and welded on both sides;

  3.3 The screw holes on the hanger must be machined (electric drill), and gas cutting is not allowed;

  3.4 The rectangular air duct hoop bracket is close to the air duct, the folding angle is straight, and there is a distance for tightening the bolts on the connection;

  3.5 When installing the air duct, fix and adjust the bracket at the same time. Its position is correct and the force should be even;

  3.6 Supports and hangers must not be located at air outlets, valves, inspection doors and automatic control mechanisms. The booms should not be directly fixed on the flange. Supports and hangers require anti-corrosion treatment.

  4. Precautions for installation of air duct components of Keruilai environmentally friendly air conditioning project:

  Before installing environmentally friendly air-conditioning components, their appearance, movement flexibility, specifications and models should be inspected, and they can be installed only if there are no abnormalities. The installation of air duct components should be carried out after the completion of the civil construction process. Those with suspended ceilings and decorations must cooperate closely. The installation must be firmly connected, the movable parts should be flexible and reliable, and the tightness should be appropriate. The installation requirements for components are as follows:

  4.1 The elbow should use a larger curvature radius R as much as possible. Usually R is 1.5-2.0 times the width B of the air duct. If R/B is less than 1.0, a deflector should be installed in the elbow to reduce resistance. ;

  4.2 The tie rod on the air duct or the rotating shaft of the handle is tightly connected to the air duct. The tie rod can be fixed at any position. The handle switch indicates the adjustment angle and direction. The valve plate is easy to adjust and must not rub against the air duct;

  4.3 When installing ducts, the connection between the air inlet and the air duct should be tight and firm, the frame should be close to the building decoration surface, the outer surface should be flat and not deformed, and the adjustment should be flexible;

  4.4 When installing pipelines, the horizontal deviation shall not be greater than 3/1000, and the vertical deviation shall not be greater than 2/1000.

Source Statement:This article is originally edited or compiled by Guangdong Symphony Keruilai Air Coolers Co., Ltd.,Ltd. If reprinted, please indicate that it comes from Guangdong Symphony Keruilai Air Coolers Co., Ltd.。The above content (including images and text) is sourced from the internet. If there is any infringement, please contact our website promptly(400 168 3989)。